This question was closed without grading. Reason: Brak odpowiedzi możliwej do przyjęcia
Feb 9, 2013 21:27
12 yrs ago
9 viewers *
polski term
Przekrój konstrukcyjny-charakterystyczny
polski > angielski
Technika/inżynieria
Budownictwo/inżynieria lądowa i wodna
wind power plants
Lista dokumentów do badania due diligence: nazwa jednego z nich to "rysunek nr 1.1.1 - Przekrój konstrukcyjny charakterystyczny drogi i placu"
Proposed translations
(angielski)
4 -1 | typical structure cross section |
IRA100
![]() |
Change log
Feb 9, 2013 21:51: IRA100 changed "Field (specific)" from "Energia elektryczna/energetyka" to "Budownictwo/inżynieria lądowa i wodna"
Proposed translations
-1
22 min
typical structure cross section
..
--------------------------------------------------
Note added at 53 min (2013-02-09 22:20:33 GMT)
--------------------------------------------------
typical road structure cross section
--------------------------------------------------
Note added at 13 godz. (2013-02-10 10:54:54 GMT)
--------------------------------------------------
The typical sections shown in the plans should represent conditions that are "typical" or representative of the project. It is not necessary to show a separate typical section to delineate relatively minor variations from the basic typical. The most common or predominant typical section on the project should be shown first in the plan sheets followed by sections of lesser significance.
--------------------------------------------------
Note added at 53 min (2013-02-09 22:20:33 GMT)
--------------------------------------------------
typical road structure cross section
--------------------------------------------------
Note added at 13 godz. (2013-02-10 10:54:54 GMT)
--------------------------------------------------
The typical sections shown in the plans should represent conditions that are "typical" or representative of the project. It is not necessary to show a separate typical section to delineate relatively minor variations from the basic typical. The most common or predominant typical section on the project should be shown first in the plan sheets followed by sections of lesser significance.
Something went wrong...