Glossary entry (derived from question below)
English term or phrase:
unity plot
Russian translation:
сводный график
Added to glossary by
True Freelancer
Nov 4, 2016 06:37
7 yrs ago
English term
Unity Plot
English to Russian
Other
Petroleum Eng/Sci
Overcalled
Undercalled
ILI Estimated Depth (%)
Field Measured Depth (%)
Unity Plot for the 2015 Magnetic Flux Leakage Inspection
2015 Digs
2012 recoats
Undercalled
ILI Estimated Depth (%)
Field Measured Depth (%)
Unity Plot for the 2015 Magnetic Flux Leakage Inspection
2015 Digs
2012 recoats
Proposed translations
(Russian)
4 +1 | сводный график | True Freelancer |
4 | * | hawkwind |
Change log
Nov 9, 2016 05:24: True Freelancer Created KOG entry
Proposed translations
+1
21 mins
Selected
сводный график
"Unity plot" скорее всего означает общий (сводный) график, в котором выводятся данные из различных исследований.
--------------------------------------------------
Note added at 22 mins (2016-11-04 07:00:13 GMT)
--------------------------------------------------
или обследований.
--------------------------------------------------
Note added at 23 mins (2016-11-04 07:00:49 GMT)
--------------------------------------------------
или обследований.
--------------------------------------------------
Note added at 22 mins (2016-11-04 07:00:13 GMT)
--------------------------------------------------
или обследований.
--------------------------------------------------
Note added at 23 mins (2016-11-04 07:00:49 GMT)
--------------------------------------------------
или обследований.
4 KudoZ points awarded for this answer.
Comment: "Спасибо! "
2 days 5 hrs
*
график корреляции двух методов оценки (измерения и т.п.) одной и той же величины
http://www.pipeline-conference.com/sites/default/files/paper...
Figure 4. Unity Plot Assessment Example Sizing
https://primis.phmsa.dot.gov/comm/reports/enforce/documents/...
The sizing accuracy of the 11-1 tool is determined by using a correlation
plot ("as reported" vs. "as identified after excavation"). Data points that
lie on a 1 :1 line ("unity plot") represent accurate tool measurement, and
data points that lie off of the 1 :1 line represent measurement error.
http://www.pipeline-conference.com/sites/default/files/paper...
Figure 4. Unity Plot Assessment Example Sizing
https://primis.phmsa.dot.gov/comm/reports/enforce/documents/...
The sizing accuracy of the 11-1 tool is determined by using a correlation
plot ("as reported" vs. "as identified after excavation"). Data points that
lie on a 1 :1 line ("unity plot") represent accurate tool measurement, and
data points that lie off of the 1 :1 line represent measurement error.
Something went wrong...